Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0535 # 05 Y:1999 | 05 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $125,200 | $140,000 | Not Implemented |
KU0534 # 01 Y:1999 | 01 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,860 | $1,000 | Not Implemented |
KU0534 # 02 Y:1999 | 02 | 1999 | MINIMIZE WATER USAGE | $84,000 | $22,000 | Not Implemented |
KU0534 # 03 Y:1999 | 03 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $9,920 | $1,360 | Not Implemented |
MO0270 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,783 | $36,941 | Implemented |
MO0270 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,802 | $10,421 | Not Implemented |
MO0270 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $235 | $53 | Not Implemented |
MO0270 # 04 Y:1999 | 04 | 1999 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $720 | $1,800 | Not Implemented |
MO0270 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $76,792 | $0 | Not Implemented |
MO0270 # 06 Y:1999 | 06 | 1999 | CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY | $4,407 | $0 | Not Implemented |
MO0269 # 01 Y:1999 | 01 | 1999 | INSTALL OCCUPANCY SENSORS | $22,189 | $4,604 | Implemented |
MO0269 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,727 | $22,000 | Not Implemented |
MO0269 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,256 | $7,330 | Implemented |
MO0269 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $681 | $80 | Implemented |
MO0269 # 05 Y:1999 | 05 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $21,492 | $0 | Not Implemented |
MO0269 # 06 Y:1999 | 06 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $6,800 | $0 | Implemented |
MO0269 # 07 Y:1999 | 07 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $539,784 | $10,944 | Not Implemented |
MO0269 # 08 Y:1999 | 08 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $359,856 | $10,944 | Not Implemented |
MO0269 # 09 Y:1999 | 09 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,354 | $157 | Implemented |
MO0268 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,133 | $14,908 | Not Implemented |
MO0268 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $721 | $40 | Not Implemented |
MO0268 # 03 Y:1999 | 03 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $192,000 | $0 | Not Implemented |
MO0268 # 04 Y:1999 | 04 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $315 | $0 | Implemented |
MO0268 # 05 Y:1999 | 05 | 1999 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $66,482 | $156,000 | Not Implemented |
MO0267 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,983 | $4,472 | Implemented |