IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0923 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,706 $21,021 Not Implemented
GT0923 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $33,904 $274,000 Not Implemented
GT0923 # 04 Y:2019 04 2019 RECOVER AND REUSE WASTE MATERIAL $31,200 $120,000 Not Implemented
LE0473 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $710 $25 Not Implemented
LE0473 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,965 $6,000 Not Implemented
LE0473 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $743 Not Implemented
LE0473 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $830 $2,550 Not Implemented
LE0473 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,413 $21,000 Not Implemented
LE0473 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $2,000 Not Implemented
TR0010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $16,540 $17,881 Implemented
TR0010 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,332 $36,474 Implemented
TR0010 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $1,984 $70 Implemented
TR0010 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $111 $100 Implemented
AM0778 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,880 $12,230 Not Implemented
AM0778 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,150 $3,000 Implemented
AM0778 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $1,800 Not Implemented
AM0778 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $300 Implemented
AM0778 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $110 $200 Implemented
AM0778 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $20 Not Implemented
WM0133 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,957 $23,048 Not Implemented
WM0133 # 02 Y:2019 02 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $15,707 $180,540 Not Implemented
WM0133 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,799 $14,222 Not Implemented
WM0133 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,331 $4,500 Not Implemented
WM0133 # 05 Y:2019 05 2019 USE RADIANT HEATER FOR SPOT HEATING $5,016 $4,425 Not Implemented
WM0133 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,363 $2,793 Not Implemented