Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
139
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0232 # 03 Y:1984 | 03 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,298 | $0 | Implemented |
GT0228 # 03 Y:1984 | 03 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,500 | $1,654 | Implemented |
GT0228 # 07 Y:1984 | 07 | 1984 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,600 | $3,000 | Implemented |
GT0228 # 02 Y:1984 | 02 | 1984 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,900 | $6,000 | Not Implemented |
TN0232 # 07 Y:1984 | 07 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,670 | $462 | Implemented |
TN0232 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $2,734 | $855 | Not Implemented |
TN0232 # 05 Y:1984 | 05 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $3,742 | $140 | Implemented |
TN0232 # 04 Y:1984 | 04 | 1984 | COVER OPEN TANKS | $5,089 | $2,750 | Not Implemented |
TN0232 # 02 Y:1984 | 02 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,721 | $18,050 | Not Implemented |
TN0232 # 01 Y:1984 | 01 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $31,111 | $4,573 | Implemented |
GT0228 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,814 | $2,100 | Implemented |
GT0228 # 01 Y:1984 | 01 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,400 | $5,000 | Not Implemented |
GT0228 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $637 | $500 | Implemented |
GT0228 # 04 Y:1984 | 04 | 1984 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,292 | $2,600 | Not Implemented |
GT0230 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $960 | $0 | Not Implemented |
GT0230 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $732 | $151 | Implemented |
GT0232 # 01 Y:1984 | 01 | 1984 | ISOLATE HOT OR COLD EQUIPMENT | $4,600 | $1,000 | Implemented |
GT0230 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $43 | $97 | Implemented |
GT0230 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,770 | $1,200 | Not Implemented |
GT0232 # 08 Y:1984 | 08 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,500 | $14,000 | Not Implemented |
GT0232 # 02 Y:1984 | 02 | 1984 | MODIFY TEXTILE DRYERS | $9,110 | $7,500 | Implemented |
GT0232 # 04 Y:1984 | 04 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,240 | $4,800 | Not Implemented |
GT0232 # 05 Y:1984 | 05 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,370 | $2,000 | Implemented |
GT0232 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $810 | $500 | Not Implemented |
GT0232 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,260 | $2,957 | Implemented |