IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3672 Printed Circuit Boards
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0283 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,520 $650 Not Implemented
CO0283 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $1,930 Implemented
CO0283 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,200 $2,520 Not Implemented
CO0283 # 05 Y:1993 05 1993 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $590 $250 Implemented
CO0283 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $150 Implemented
CO0283 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,250 $36,500 Not Implemented
SF0009 # 01 Y:1993 01 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,671 $1,500 Not Implemented
SF0009 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $2,947 Not Implemented
SF0009 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $235 Not Implemented
SF0009 # 04 Y:1993 04 1993 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,790 $1,200 Not Implemented
SF0009 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $694 Not Implemented
MA0274 # 01 Y:1993 01 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $9,079 $2,733 Not Implemented
MA0274 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,949 $125 Not Implemented
MA0274 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $853 $0 Not Implemented
MA0274 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $585 $91 Not Implemented
MA0274 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $687 $169 Not Implemented
UD0402 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $4,680 $1,500 Implemented
UD0402 # 07 Y:1993 07 1993 INSTALL TIMERS AND/OR THERMOSTATS $2,295 $1,350 Implemented
UD0402 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,502 $25,812 Implemented
UD0402 # 06 Y:1993 06 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,782 $15,000 Implemented
UD0402 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,064 $0 Implemented
UD0402 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,502 $0 Implemented
UD0402 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,564 $0 Not Implemented
OR0170 # 06 Y:1993 06 1993 RECOVER AND REUSE COOLING WATER $5,728 $20,750 Not Implemented
OR0170 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $391 $1,519 Implemented