Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0283 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,911 | $8,591 | n/a |
UA0283 # 06 Y:2023 | 06 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,662 | $6,036 | n/a |
UA0283 # 11 Y:2023 | 11 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,688 | $31,108 | n/a |
UA0283 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,087 | $0 | n/a |
UA0283 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,686 | $750 | n/a |
UA0283 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $14,473 | $2,726 | n/a |
UA0283 # 10 Y:2023 | 10 | 2023 | USE SYNTHETIC LUBRICANT | $6,907 | $21,930 | n/a |
UA0283 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $4,924 | $754 | n/a |
UA0283 # 05 Y:2023 | 05 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $21,298 | $0 | n/a |
UA0283 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $416,153 | $3,377,796 | n/a |
UA0283 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,247 | $22,655 | n/a |
UA0282 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $95 | $250 | n/a |
UA0282 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,197 | $297 | n/a |
UA0282 # 02 Y:2023 | 02 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $3,292 | $5,675 | n/a |
UA0282 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $3,672 | $165 | n/a |
UA0282 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $927 | $1,176 | n/a |
UA0282 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,227 | $1,174 | n/a |
UA0281 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,002 | $15,154 | n/a |
UA0281 # 07 Y:2023 | 07 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,437 | $26,750 | n/a |
UA0281 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,808 | $5,698 | n/a |
UA0281 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $18,036 | $12,615 | n/a |
UA0281 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,375 | $1,000 | n/a |
UA0281 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $6,060 | $1,885 | n/a |
UA0281 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,484 | $8,591 | n/a |
UA0281 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,483 | $47,040 | n/a |