IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0353 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,048 $8,000 Implemented
UF0353 # 05 Y:2004 05 2004 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $17,635 $0 Implemented
UF0353 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $2,140 Implemented
UF0353 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,503 $546 Implemented
UF0353 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,666 $2,499 Implemented
UF0348 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,169 $10,500 Implemented
UF0348 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,760 $0 Implemented
UF0348 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,977 $456 Implemented
UF0348 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,203 $6,441 Implemented
UF0348 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $39,206 $74,000 Implemented
UF0348 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $7,249 $0 Implemented
UF0348 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,420 $29,400 Implemented
UF0348 # 01 Y:2004 01 2004 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,333,121 $2,700,000 Implemented
GT0780 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,020 $11,903 Implemented
GT0780 # 12 Y:2004 12 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $2,490 $800 Implemented
GT0780 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,453 $900 Implemented
GT0780 # 07 Y:2004 07 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,729 $1,209 Implemented
GT0780 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,772 $500 Implemented
GT0780 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,654 $10,261 Implemented