IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

525

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0040 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,134 $2,543 Implemented
AS0040 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,889 $1,000 Implemented
AS0040 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,948 $0 Implemented
AS0040 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,041 $500 Implemented
AS0040 # 07 Y:1991 07 1991 UPGRADE OBSOLETE EQUIPMENT $10,456 $0 Implemented
AS0040 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,777 $555 Implemented
AS0040 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $776 Implemented
AS0040 # 10 Y:1991 10 1991 INSTALL SET-BACK TIMERS $3,044 $900 Implemented
AS0040 # 11 Y:1991 11 1991 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $190,214 $0 Implemented
AS0040 # 12 Y:1991 12 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,916 $2,500 Implemented
AS0040 # 13 Y:1991 13 1991 INSULATE BARE EQUIPMENT $33,741 $18,360 Implemented
AS0040 # 14 Y:1991 14 1991 INSULATE BARE EQUIPMENT $152 $165 Implemented
AS0039 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,490 $35,000 Not Implemented
AS0039 # 02 Y:1991 02 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,531 $1,000 Not Implemented
AS0039 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $200 Not Implemented
AS0039 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $300 Not Implemented
AS0039 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $392 $0 Not Implemented
AS0039 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $663 Not Implemented
AS0039 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $0 Not Implemented
AS0039 # 08 Y:1991 08 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $3,190 Not Implemented
AS0039 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $30 Not Implemented
AS0039 # 10 Y:1991 10 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $315 $100 Not Implemented
AS0035 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $495 $698 Implemented
AS0035 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $265 $0 Implemented
AS0035 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,203 $1,000 Implemented