IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0118 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,575 $2,700 Implemented
SF0118 # 02 Y:1997 02 1997 USE PHOTOCELL CONTROLS $3,456 $2,000 Implemented
SF0118 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,464 $1,356 Implemented
SF0118 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $369 $365 Implemented
SF0118 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,770 $14,926 Implemented
SF0118 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,598 $14,138 Implemented
SF0118 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $499 $250 Implemented
SF0118 # 10 Y:1997 10 1997 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $4,583 $500 Implemented
SF0118 # 11 Y:1997 11 1997 $46,724 $32,060 Implemented
SF0045 # 03 Y:1994 03 1994 USE OPTIMUM THICKNESS INSULATION $1,262 $773 Implemented
SF0045 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $11,628 $9,140 Implemented
SF0045 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $386 $300 Implemented
SF0045 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $917 $2,200 Implemented
SD0084 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,982 $19,450 Implemented
SD0084 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $250 Implemented
SD0084 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $288 $1,350 Implemented
SD0084 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $454 $933 Implemented
SD0075 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,483 $9,520 Implemented
SD0075 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $25 Implemented
SD0075 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,568 $850 Implemented
SD0075 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,928 $10,572 Implemented
SD0075 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $13,383 $7,270 Implemented
SD0075 # 07 Y:1994 07 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,552 $260 Implemented
SD0075 # 08 Y:1994 08 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,874 $240 Implemented
SD0075 # 09 Y:1994 09 1994 INSTALL OCCUPANCY SENSORS $3,743 $3,280 Implemented