IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0383 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,563 $42,318 Not Implemented
SF0383 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,697 $28,699 Not Implemented
SF0383 # 05 Y:2010 05 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,340 $20,638 Not Implemented
SF0383 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $222 $1,278 Not Implemented
SF0383 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,819 $14,000 Not Implemented
SF0383 # 08 Y:2010 08 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,999 $26,118 Not Implemented
SF0381 # 01 Y:2010 01 2010 USE OPTIMUM TEMPERATURE $2,152 $0 Implemented
SF0381 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,764 $7,740 Not Implemented
SF0381 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $4,908 $3,317 Not Implemented
SF0381 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $23,088 Implemented
SF0381 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $2,633 $4,117 Not Implemented
SF0381 # 06 Y:2010 06 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,502 $6,175 Implemented
SF0381 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $841 $2,812 Implemented
SF0381 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,109 $14,000 Not Implemented
SF0381 # 09 Y:2010 09 2010 UPGRADE CONTROLS ON COMPRESSORS $6,768 $25,263 Not Implemented
SD0424 # 01 Y:2010 01 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $67,934 $1,710 Implemented
SD0424 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,306 $7,308 Implemented
SD0424 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,177 $4,500 Implemented
SD0424 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,138 $14,750 Not Implemented
SD0424 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,815 $16,270 Not Implemented
SD0424 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,490 $10,074 Not Implemented
SD0424 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $8,162 $31,629 Not Implemented
SF0380 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $360 Implemented
SF0380 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,794 $1,762 Implemented
SF0380 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,815 $3,010 Implemented