IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0404 # 07 Y:2007 07 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,571 $15,174 Implemented
UF0404 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,000 $270 Implemented
MI0140 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,875 $30 Implemented
MI0140 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,834 $1,074 Implemented
MI0140 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,195 $940 Implemented
MI0133 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $34,704 $0 Implemented
MI0133 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,584 $964 Implemented
MI0133 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,755 $30 Implemented
MI0132 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49 $2,342 Implemented
MI0132 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $889 $0 Implemented
MI0132 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $222 $1,732 Implemented
MI0130 # 01 Y:2006 01 2006 REDESIGN PROCESS $7,148 $580 Implemented
MI0130 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,958 $202 Implemented
MI0130 # 03 Y:2006 03 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,791 $1,020 Implemented
MI0130 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,865 $1,074 Implemented
MI0130 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,895 $3,800 Implemented
MI0127 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,532 $33,405 Implemented
MI0127 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,597 $1,074 Implemented
MI0127 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,084 $4,800 Implemented
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
MI0121 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,669 $0 Implemented
MI0121 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,209 $420 Implemented
MI0121 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,015 $964 Implemented
UF0360 # 01 Y:2005 01 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,102 $34,362 Implemented
UF0360 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,418 $744 Implemented