IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 3332 Industrial Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0269 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $1,660 Implemented
MI0269 # 10 Y:2014 10 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,064 $360 Implemented
MI0269 # 08 Y:2014 08 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,668 $6,886 Implemented
MI0269 # 07 Y:2014 07 2014 INSTALL SKYLIGHTS $2,957 $500 Implemented
MI0269 # 06 Y:2014 06 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,491 $9,600 Implemented
MI0269 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,528 $2,040 Implemented
MI0269 # 04 Y:2014 04 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,584 $3,600 Implemented
MI0269 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,693 $150,000 Implemented
MI0236 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,041 $1,660 Implemented
MI0236 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,939 $63,550 Implemented
MI0236 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,443 $1,800 Implemented
MI0236 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,720 $80 Implemented
MI0236 # 07 Y:2013 07 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,102 $447 Implemented
MI0236 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,087 $80 Implemented
MI0236 # 09 Y:2013 09 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $916 $40 Implemented
UF0399 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,878 $437 Implemented
UF0399 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,852 $0 Implemented
UF0399 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $1,761 $404 Implemented
UF0399 # 12 Y:2007 12 2007 $74,852 $731 Implemented
UF0399 # 11 Y:2007 11 2007 RECYCLE FLUORESCENT LAMPS $1,005 $3,486 Implemented
MI0123 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,583 $140 Implemented
MI0123 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,670 $84 Implemented
MI0123 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $1,018 Implemented
MI0123 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $845 $660 Implemented
MI0123 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $403 $335 Implemented