IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,188

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0062 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $3,350 Implemented
UF0062 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,297 $41,915 Implemented
UF0062 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,394 $0 Not Implemented
UF0062 # 04 Y:1993 04 1993 REPAIR AND ELIMINATE STEAM LEAKS $2,765 $1,200 Implemented
UF0062 # 05 Y:1993 05 1993 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $665,168 $3,843,600 Not Implemented
UF0053 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,533 $3,596 Implemented
UF0053 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,538 $4,770 Not Implemented
UF0053 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $239 $812 Implemented
UF0053 # 04 Y:1993 04 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $374 $565 Implemented
UF0053 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,064 $20,264 Implemented
UF0053 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,268 $1,175 Implemented
UF0053 # 07 Y:1993 07 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $61,857 $186,150 Not Implemented
UF0034 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,358 $0 Not Implemented
UF0034 # 02 Y:1992 02 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,737 $14,960 Not Implemented
UF0034 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $18,601 Implemented
UF0034 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,299 $400 Implemented
UF0034 # 05 Y:1992 05 1992 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $51,194 $68,400 Not Implemented
UF0034 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,213 $1,000 Implemented
UF0034 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $7,986 $5,200 Implemented
UF0036 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $282 Not Implemented
UF0036 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $3,496 $12,120 Not Implemented
UF0036 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $1,603 Not Implemented
UF0036 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21 $4,164 Not Implemented
UF0036 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $29 $75 Not Implemented
UF0036 # 06 Y:1992 06 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,728 $42,000 Not Implemented