IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0306 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,764 $7,800 Not Implemented
UF0306 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,327 $0 Implemented
UF0306 # 04 Y:2002 04 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $592,558 $1,120,000 Not Implemented
UF0306 # 05 Y:2002 05 2002 RECOVER AND REUSE WASTE MATERIAL $10,048 $0 Not Implemented
UF0306 # 06 Y:2002 06 2002 $48,671 $1,074 Not Implemented
UF0306 # 07 Y:2002 07 2002 $208,938 $33,980 Not Implemented
UF0306 # 08 Y:2002 08 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $107,170 $114,485 Not Implemented
UF0306 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $5,064 Implemented
MI0049 # 06 Y:2002 06 2002 $3,658 $3,000 Implemented
MI0049 # 02 Y:2002 02 2002 $259,200 $75,000 n/a
MI0049 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,846 $11,811 n/a
MI0049 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,366 $480 Not Implemented
MI0049 # 05 Y:2002 05 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,959 $360 Not Implemented
MI0049 # 01 Y:2002 01 2002 $1,206,000 $100 Implemented
MI0048 # 03 Y:2002 03 2002 $123,500 $300 Not Implemented
MI0048 # 06 Y:2002 06 2002 METER WASTE WATER $577 $1,454 Not Implemented
MI0048 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,814 $4,500 Not Implemented
MI0048 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $1,911 $350 Implemented
MI0048 # 01 Y:2002 01 2002 $1,989,000 $115,000 Implemented
MI0048 # 02 Y:2002 02 2002 $1,989,000 $7,850 Not Implemented
MI0047 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $58,883 $34,500 n/a
MI0047 # 02 Y:2002 02 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,579 $7 Not Implemented
MI0047 # 03 Y:2002 03 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $12,504 $209 Not Implemented
MI0047 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,129 $1,916 Not Implemented
MI0047 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $10,502 $3,900 Not Implemented