IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

181

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0292 # 07 Y:2016 07 2016 USE OPTIMUM THICKNESS INSULATION $2,670 $1,810 Implemented
MI0292 # 08 Y:2016 08 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,585 $670 Not Implemented
MI0292 # 09 Y:2016 09 2016 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,313 $480 Not Implemented
MI0292 # 10 Y:2016 10 2016 USE PHOTOCELL CONTROLS $183 $480 Implemented
MI0291 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,064 $180,000 Not Implemented
MI0291 # 02 Y:2016 02 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,909 $22,520 Not Implemented
MI0291 # 03 Y:2016 03 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,963 $23,683 Not Implemented
MI0291 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,153 $1,660 Implemented
MI0291 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,659 $40 Implemented
MI0291 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $40 Implemented
MI0291 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,625 $3,600 Implemented
MI0291 # 08 Y:2016 08 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,195 $1,128 Not Implemented
MI0291 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,071 $120 Implemented
MI0291 # 10 Y:2016 10 2016 PAY UTILITY BILLS ON TIME $1,589 $0 Implemented
MI0291 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,180 $760 Implemented
MI0291 # 12 Y:2016 12 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,118 $4,691 Not Implemented
MI0291 # 13 Y:2016 13 2016 INSTALL OCCUPANCY SENSORS $889 $683 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 03 Y:2016 03 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,761 $41,950 Not Implemented
MI0290 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,730 $16,200 Implemented
MI0290 # 05 Y:2016 05 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,243 $6,421 Not Implemented
MI0290 # 06 Y:2016 06 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,225 $15,465 Not Implemented
MI0290 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $6,880 Not Implemented
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented