IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 3256 Soap, Cleaning Compound, and Toilet Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0380 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $120 Implemented
MI0380 # 08 Y:2020 08 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $421 $1,231 Not Implemented
MI0328 # 10 Y:2018 10 2018 USE PHOTOCELL CONTROLS $1,016 $2,773 Implemented
MI0328 # 11 Y:2018 11 2018 INSULATE BARE EQUIPMENT $1,011 $206 Not Implemented
MI0328 # 09 Y:2018 09 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,121 $1,501 Implemented
MI0328 # 08 Y:2018 08 2018 USE PHOTOCELL CONTROLS $2,086 $5,544 Implemented
MI0328 # 07 Y:2018 07 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,824 $5,032 Implemented
MI0328 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,307 $13,190 Implemented
MI0328 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,680 $40 Implemented
MI0328 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,135 $1,660 Implemented
MI0328 # 03 Y:2018 03 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,041 $25,680 Not Implemented
MI0328 # 02 Y:2018 02 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,847 $63,840 Implemented
MI0328 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,062 $127,500 Not Implemented
MI0234 # 09 Y:2013 09 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $159 $380 Not Implemented
MI0234 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,388 $80 Implemented
MI0234 # 08 Y:2013 08 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $252 $447 Implemented
MI0234 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $311 $600 Not Implemented
MI0234 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,103 $80 Implemented
MI0234 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,067 $2,520 Implemented
MI0234 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,115 $8,409 Implemented
MI0234 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,377 $1,660 Implemented
MI0234 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,035 $2,600 Implemented
UF0370 # 11 Y:2005 11 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,313 $0 Implemented
UF0370 # 12 Y:2005 12 2005 $3,223 $12,400 Not Implemented
UF0370 # 10 Y:2005 10 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $760 Not Implemented