Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
127
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0228 # 02 Y:1984 | 02 | 1984 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,900 | $6,000 | Not Implemented |
GT0228 # 01 Y:1984 | 01 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,400 | $5,000 | Not Implemented |
GT0228 # 07 Y:1984 | 07 | 1984 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,600 | $3,000 | Implemented |
GT0228 # 04 Y:1984 | 04 | 1984 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,292 | $2,600 | Not Implemented |
GT0228 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $637 | $500 | Implemented |
GT0228 # 03 Y:1984 | 03 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,500 | $1,654 | Implemented |
GT0228 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,814 | $2,100 | Implemented |
GT0230 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $960 | $0 | Not Implemented |
GT0232 # 02 Y:1984 | 02 | 1984 | MODIFY TEXTILE DRYERS | $9,110 | $7,500 | Implemented |
GT0232 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $810 | $500 | Not Implemented |
GT0232 # 08 Y:1984 | 08 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,500 | $14,000 | Not Implemented |
GT0232 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,260 | $2,957 | Implemented |
GT0230 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,770 | $1,200 | Not Implemented |
GT0230 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $43 | $97 | Implemented |
GT0230 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $732 | $151 | Implemented |
GT0232 # 01 Y:1984 | 01 | 1984 | ISOLATE HOT OR COLD EQUIPMENT | $4,600 | $1,000 | Implemented |
GT0232 # 05 Y:1984 | 05 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,370 | $2,000 | Implemented |
GT0232 # 07 Y:1984 | 07 | 1984 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $940 | $1,582 | Implemented |
GT0232 # 09 Y:1984 | 09 | 1984 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $820 | $6,438 | Not Implemented |
GT0232 # 04 Y:1984 | 04 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,240 | $4,800 | Not Implemented |
GT0233 # 01 Y:1984 | 01 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,800 | $8,000 | Not Implemented |
GT0233 # 04 Y:1984 | 04 | 1984 | CONTROL PRESSURE ON STEAMER OPERATIONS | $54,023 | $16,000 | Implemented |
GT0233 # 05 Y:1984 | 05 | 1984 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,500 | $8,000 | Implemented |
GT0233 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $840 | $1,000 | Not Implemented |
GT0233 # 03 Y:1984 | 03 | 1984 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $11,800 | $17,000 | Not Implemented |