IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0267 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,200 $600 Implemented
GT0267 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $450 Implemented
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
GT0262 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $500 Implemented
GT0262 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92 $27 Implemented
GT0262 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $165 $168 Implemented
GT0262 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $468 $75 Implemented
GT0249 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,317 $500 Implemented
GT0249 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $277 Implemented
GT0249 # 04 Y:1985 04 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $277 $150 Implemented
GT0248 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $722 $581 Implemented
GT0248 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $222 Implemented
GT0248 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $937 $125 Implemented
GT0248 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,875 $500 Implemented
GT0248 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $97,891 $0 Implemented
GT0235 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $250 Implemented
GT0235 # 02 Y:1984 02 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $136 $473 Implemented
GT0235 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $840 $1,100 Implemented
GT0128 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,768 $500 Implemented
GT0128 # 02 Y:1982 02 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $4,227 $2,513 Implemented
GT0128 # 03 Y:1982 03 1982 USE MINIMUM SAFE OVEN VENTILATION $4,221 $22 Implemented
GT0128 # 04 Y:1982 04 1982 REPAIR AND ELIMINATE STEAM LEAKS $1,084 $180 Implemented
GT0128 # 05 Y:1982 05 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,142 $150 Implemented