Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0432 # 08 Y:2008 | 08 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,295 | $3,442 | Not Implemented |
IA0432 # 07 Y:2008 | 07 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $423 | $143 | Implemented |
IA0432 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $330 | Implemented |
IA0432 # 12 Y:2008 | 12 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,480 | $5,333 | Implemented |
IA0432 # 11 Y:2008 | 11 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,042 | $930 | Not Implemented |
IA0432 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $322 | Implemented |
IA0432 # 10 Y:2008 | 10 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,529 | $1,781 | Not Implemented |
IA0432 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,859 | $620 | Implemented |
IA0432 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $986 | $67 | Not Implemented |
IA0432 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,099 | $1,884 | Implemented |
IA0432 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $979 | $17 | Implemented |
IA0432 # 09 Y:2008 | 09 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $571 | $1,650 | Implemented |
IA0331 # 15 Y:2003 | 15 | 2003 | $9,200 | $12,500 | Implemented | |
IA0331 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,790 | $5,790 | Not Implemented |
IA0331 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $614 | $586 | Implemented |
IA0331 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $1,738 | Implemented |
IA0331 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,450 | $1,754 | Implemented |
IA0331 # 09 Y:2003 | 09 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,789 | $29,757 | Not Implemented |
IA0331 # 11 Y:2003 | 11 | 2003 | INSULATE BARE EQUIPMENT | $1,491 | $3,352 | Not Implemented |
IA0331 # 14 Y:2003 | 14 | 2003 | COVER OPEN TANKS | $1,451 | $4,500 | Not Implemented |
IA0331 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,482 | $915 | Implemented |
IA0331 # 12 Y:2003 | 12 | 2003 | $200,000 | $200,000 | Not Implemented | |
IA0331 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,662 | $3,125 | Implemented |
IA0331 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,583 | $1,994 | Not Implemented |
IA0331 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $203 | $599 | Implemented |