Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0245 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $23,890 | $13,698 | Implemented |
IC0245 # 04 Y:2020 | 04 | 2020 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,231 | $0 | Implemented |
IC0245 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $951 | $801 | Implemented |
IC0245 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,465 | $4,250 | Implemented |
IC0245 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $575 | $517 | Implemented |
IC0244 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,190 | $6,120 | Not Implemented |
IC0244 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $732 | $534 | Not Implemented |
IC0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,228 | $517 | Implemented |
IC0244 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,307 | $4,150 | Implemented |
IC0243 # 01 Y:2020 | 01 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $1,582 | $31,846 | Not Implemented |
IC0243 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,674 | $140,751 | Implemented |
IC0243 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,698 | $6,150 | Implemented |
IC0243 # 04 Y:2020 | 04 | 2020 | USE OPTIMUM TEMPERATURE | $24,347 | $0 | Not Implemented |
IC0243 # 05 Y:2020 | 05 | 2020 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $21,681 | $40,000 | Not Implemented |
IC0243 # 06 Y:2020 | 06 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $130,722 | $713,750 | Implemented |
IC0242 # 02 Y:2020 | 02 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,255 | $10,230 | Not Implemented |
IC0242 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,050 | $2,715 | Not Implemented |
IC0242 # 06 Y:2020 | 06 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,655 | $0 | Not Implemented |
IC0242 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,675 | $4,640 | Not Implemented |
IC0242 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,839 | $0 | Not Implemented |
IC0242 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,538 | $5,100 | Not Implemented |
IC0241 # 03 Y:2020 | 03 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $5,410 | $0 | Implemented |
IC0241 # 04 Y:2020 | 04 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,230 | $0 | Implemented |
IC0241 # 05 Y:2020 | 05 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,157 | $12,984 | Implemented |
IC0241 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $4,105 | Implemented |