IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0103 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,030 $100 Not Implemented
KU0103 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $115 $180 Not Implemented
KU0103 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $335 $450 Not Implemented
KU0103 # 06 Y:1983 06 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $85 $0 Not Implemented
KU0103 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,466 $89 Not Implemented
KU0103 # 08 Y:1983 08 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,369 $200 Not Implemented
KU0103 # 09 Y:1983 09 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $81 $0 Not Implemented
KU0103 # 10 Y:1983 10 1983 INSULATE BARE EQUIPMENT $4,862 $2,500 Not Implemented
KU0103 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $862 Not Implemented
KU0094 # 03 Y:1983 03 1983 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,187 $715 Implemented
KU0094 # 07 Y:1983 07 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $342 $0 Implemented
KU0094 # 06 Y:1983 06 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $240 Implemented
KU0094 # 05 Y:1983 05 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $953 $300 Implemented
KU0094 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $1,127 $1,200 Implemented
KU0094 # 02 Y:1983 02 1983 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,270 $360 Implemented
KU0094 # 01 Y:1983 01 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,596 $800 Implemented
KU0087 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,398 $30,000 Implemented
KU0087 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $15,570 $15,000 Implemented
KU0087 # 03 Y:1983 03 1983 MODERATE COOLING TOWER OUTLET TEMPERATURE $4,858 $0 Implemented
KU0087 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $39,664 $35,000 Implemented
KU0087 # 05 Y:1983 05 1983 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,056 $1,680 Implemented
KU0087 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,313 Not Implemented