IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0293 # 08 Y:1986 08 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,279 $300 Not Implemented
TN0293 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $180 Implemented
TN0293 # 06 Y:1986 06 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $625 $500 Not Implemented
TN0293 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $640 $0 Implemented
TN0293 # 04 Y:1986 04 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,798 $500 Not Implemented
TN0293 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,536 $0 Not Implemented
TN0293 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,716 $2,811 Implemented
TN0293 # 02 Y:1986 02 1986 USE OPTIMUM THICKNESS INSULATION $1,969 $500 Not Implemented
TN0291 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,590 $1,809 Implemented
TN0291 # 07 Y:1986 07 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $295 Implemented
TN0291 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $375 Implemented
TN0291 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $2,828 $4,867 Implemented
TN0291 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $518 $0 Implemented
TN0291 # 03 Y:1986 03 1986 USE MINIMUM STEAM OPERATING PRESSURE $3,004 $0 Not Implemented
TN0291 # 01 Y:1986 01 1986 HEAT WATER WITH EXHAUST HEAT $13,649 $22,800 Not Implemented
UD0204 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,358 $250 Not Implemented
UD0204 # 02 Y:1986 02 1986 HEAT WATER WITH EXHAUST HEAT $12,542 $23,373 Implemented
UD0204 # 03 Y:1986 03 1986 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,103 $10,000 Not Implemented
UD0204 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,866 $31,210 Implemented
UD0204 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $331 Implemented
UD0204 # 06 Y:1986 06 1986 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,924 $1,600 Not Implemented
UD0204 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $668 $2,000 Implemented
UD0201 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,240 $0 Implemented
UD0201 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $7,035 $11,000 Implemented
UD0201 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $284 $405 Not Implemented