Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8418 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $1,816 | $2,450 | n/a |
LT8418 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,288 | $104,233 | n/a |
LT8418 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,083 | $8,430 | n/a |
LT8418 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,034 | $35,000 | n/a |
LT8418 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,113 | $0 | n/a |
LT8417 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,056 | $0 | n/a |
LT8417 # 03 Y:2024 | 03 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,894 | $485,500 | n/a |
LT8417 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $0 | n/a |
LT8417 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,666 | $39,130 | n/a |
LS1024 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $2,423 | $875 | n/a |
LS1024 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,551 | $5,440 | n/a |
LS1024 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $343 | $0 | n/a |
LS1024 # 04 Y:2024 | 04 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,635 | $2,352 | n/a |
LS1024 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,372 | $0 | n/a |
LS0924 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,561 | $98,980 | n/a |
LS0924 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,495 | $10,257 | n/a |
LS0924 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,991 | $0 | n/a |
LS0924 # 04 Y:2024 | 04 | 2024 | REDUCE HEAT GAIN BY WINDOW TINTING | $1,620 | $2,352 | n/a |
LS0924 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $5,358 | $875 | n/a |
LS0924 # 02 Y:2024 | 02 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,667 | $250 | n/a |
LS2421 # 05 Y:2024 | 05 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $21,228 | $141,000 | n/a |
LS2421 # 01 Y:2024 | 01 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $33,742 | $15,900 | n/a |
LS2421 # 04 Y:2024 | 04 | 2024 | INSTALL WIND POWERED ELECTRIC GENERATOR | $148,851 | $560,000 | n/a |
LS2421 # 03 Y:2024 | 03 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $590,512 | $783,539 | n/a |
LS2421 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $8,504 | $12,500 | n/a |