IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0026 # 01 Y:1985 01 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,637 $3,240 Not Implemented
TS0026 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $325 $460 Not Implemented
TS0026 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,640 $503 Not Implemented
TS0026 # 04 Y:1985 04 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,372 $400 Not Implemented
TS0023 # 01 Y:1985 01 1985 OPTIMIZE PLANT POWER FACTOR $1,342 $4,400 Not Implemented
TS0023 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,162 $0 Not Implemented
TS0023 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $0 Not Implemented
TS0023 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $601 $0 Not Implemented
TS0018 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,252 $23,421 Not Implemented
TS0018 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,124 $0 Not Implemented
TS0018 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,974 $5,200 Not Implemented
TS0015 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,193 $7,000 Implemented
TS0015 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $951 $575 Implemented
TS0015 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $433 $150 Implemented
TS0015 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $0 Implemented
TS0015 # 05 Y:1985 05 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,190 $2,100 Implemented