Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0397 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $13,335 $30,200 Not Implemented
UM0397 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $239 $10 Implemented
UM0397 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $5,033 $200 Implemented
UM0396 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $3,985 $2,500 Not Implemented
UM0398 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,482 $1,157 Implemented
UM0398 # 02 Y:2011 02 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,496 $10,350 Not Implemented
UM0398 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,477 $500 Implemented
UM0398 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,186 $0 Implemented
UM0398 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,500 $7,000 Not Implemented
UM0395 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $8,974 $8,890 Not Implemented
UM0395 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $51,920 $110,521 Not Implemented
UM0395 # 05 Y:2011 05 2011 HEAT WATER WITH EXHAUST HEAT $798 $2,261 Not Implemented
UM0395 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,425 $15,571 Not Implemented
UM0395 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $222 $161 Not Implemented
UM0395 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,323 $5,000 Not Implemented
UM0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $4,589 $3,850 Not Implemented
UM0394 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $5,000 Not Implemented
UM0394 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,227 $12,120 Not Implemented
UM0394 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,902 $10,000 Not Implemented
UM0394 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,893 $37,992 Not Implemented
UM0394 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Implemented
UM0394 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $180 $10 Not Implemented
UM0394 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,389 $1,350 Not Implemented
UM0394 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Implemented
UM0393 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $1,916 $1,200 Implemented