Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
294
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0360 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $770 | $1,900 | Not Implemented |
KU0360 # 02 Y:1991 | 02 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,473 | $22,500 | Not Implemented |
KU0360 # 01 Y:1991 | 01 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,710 | $6,000 | Not Implemented |
KU0360 # 05 Y:1991 | 05 | 1991 | ISOLATE HOT OR COLD EQUIPMENT | $1,192 | $300 | Not Implemented |
KU0360 # 04 Y:1991 | 04 | 1991 | INSTALL AUTOMATIC STACK DAMPER | $1,794 | $2,525 | Not Implemented |
KU0360 # 07 Y:1991 | 07 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $377 | $310 | Not Implemented |
KU0360 # 03 Y:1991 | 03 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,987 | $150 | Not Implemented |
KU0359 # 01 Y:1991 | 01 | 1991 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,092 | $2,000 | Implemented |
KU0358 # 02 Y:1991 | 02 | 1991 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $14,710 | $12,800 | Not Implemented |
KU0358 # 01 Y:1991 | 01 | 1991 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $35,057 | $12,000 | Not Implemented |
MO0044 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,326 | $0 | Implemented |
MO0044 # 01 Y:1991 | 01 | 1991 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $20,836 | $26,565 | Implemented |
KU0359 # 04 Y:1991 | 04 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $678 | $0 | Implemented |
MO0044 # 03 Y:1991 | 03 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,455 | $20 | Implemented |
KU0359 # 02 Y:1991 | 02 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $747 | $120 | Implemented |
MO0044 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,584 | $561 | Implemented |
KU0358 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $0 | Not Implemented |
KU0359 # 03 Y:1991 | 03 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $775 | $1,250 | Implemented |
KU0358 # 06 Y:1991 | 06 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $156 | $280 | Not Implemented |
KU0357 # 03 Y:1991 | 03 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $2,670 | $2,850 | Not Implemented |
KU0357 # 02 Y:1991 | 02 | 1991 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $3,415 | $0 | Not Implemented |
MO0045 # 06 Y:1991 | 06 | 1991 | USE OPTIMUM THICKNESS INSULATION | $1,230 | $857 | Not Implemented |
KU0359 # 05 Y:1991 | 05 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $122 | $150 | Implemented |
KU0358 # 03 Y:1991 | 03 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,900 | $38,600 | Not Implemented |
KU0358 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,286 | $39,000 | Not Implemented |