Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0085 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,936 | $7,682 | Not Implemented |
UA0085 # 10 Y:2012 | 10 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $529,960 | $400,000 | Not Implemented |
UA0085 # 08 Y:2012 | 08 | 2012 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $48,968 | $131,587 | Not Implemented |
UA0085 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349,571 | $177,363 | Not Implemented |
UA0085 # 06 Y:2012 | 06 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $146,229 | $68,100 | Not Implemented |
UA0085 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $58,443 | $1,920 | Implemented |
UA0085 # 03 Y:2012 | 03 | 2012 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $86,957 | $214,808 | Not Implemented |
UA0085 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $151,364 | $35,390 | Implemented |
UA0085 # 02 Y:2012 | 02 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $164,656 | $57,024 | Implemented |
UA0085 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $6,264,801 | $14,443,176 | Not Implemented |
LL0369 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,656 | $11,200 | Not Implemented |
LL0369 # 09 Y:2012 | 09 | 2012 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $10,920 | $2,084 | Not Implemented |
LL0369 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $188 | $213 | Not Implemented |
LL0369 # 07 Y:2012 | 07 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $200 | $155 | Not Implemented |
LL0369 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $419 | $735 | Not Implemented |
LL0369 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $584 | $735 | Not Implemented |
LL0369 # 04 Y:2012 | 04 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,500 | $660 | Not Implemented |
LL0369 # 03 Y:2012 | 03 | 2012 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,943 | $630 | Not Implemented |
LL0369 # 02 Y:2012 | 02 | 2012 | USE PHOTOCELL CONTROLS | $3,740 | $120 | Not Implemented |
MS0390 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,384 | $351 | Not Implemented |
MS0390 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $24,932 | Not Implemented |
MS0390 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,662 | $51,336 | Not Implemented |
MS0391 # 01 Y:2012 | 01 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $15,275 | $606 | Not Implemented |
MS0392 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,327 | $5,642 | Not Implemented |
MS0391 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $360 | $1,800 | Not Implemented |