IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0098 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,134 $302 Not Implemented
RU0098 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented
RU0098 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,377 $1,250 Not Implemented
RU0098 # 09 Y:1990 09 1990 REPAIR AND ELIMINATE STEAM LEAKS $11,639 $1,455 Implemented
RU0098 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,642 $0 Implemented
RU0098 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,352 $500 Not Implemented
RU0098 # 08 Y:1990 08 1990 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,333 $13,400 Not Implemented
RU0098 # 07 Y:1990 07 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,437 $6,800 Not Implemented
RU0072 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,696 $416 Implemented
RU0072 # 01 Y:1989 01 1989 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $34,166 $0 Not Implemented
RU0072 # 02 Y:1989 02 1989 IMPROVE LUBRICATION PRACTICES $2,938 $800 Not Implemented
RU0072 # 03 Y:1989 03 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,681 $6,660 Not Implemented
RU0072 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,337 $2,400 Implemented
RU0072 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,923 $400 Implemented
RU0072 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,545 $0 Implemented
RU0014 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,304 $600 Implemented
RU0014 # 04 Y:1987 04 1987 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,240 $7,010 Implemented
RU0014 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $389 $500 Not Implemented
RU0014 # 02 Y:1987 02 1987 IMPROVE LUBRICATION PRACTICES $266 $0 Not Implemented
RU0014 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $200 Implemented
ST0054 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,436 $100 Implemented
ST0054 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 Implemented
ST0054 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,651 $537 Implemented
ST0054 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,335 $2,057 Implemented
ST0054 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $2,167 $500 Not Implemented