IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0042 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,309 $1,610 Implemented
UD0042 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,870 $1,450 Implemented
UD0042 # 03 Y:1982 03 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,580 $139 Implemented
UD0042 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,997 $0 Implemented
UD0042 # 05 Y:1982 05 1982 REDUCE GLAZED AREAS IN BUILDINGS $1,633 $3,410 Implemented
UD0042 # 06 Y:1982 06 1982 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $866 $4,000 Implemented
UD0028 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $828 $482 Implemented
UD0028 # 02 Y:1982 02 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,052 $0 Implemented
UD0028 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $516 $250 Implemented
UD0023 # 01 Y:1982 01 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,104 $6,705 Implemented
UD0023 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $14,006 $3,864 Implemented
UD0023 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,266 $300 Implemented
UD0019 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $550 $150 Implemented
UD0019 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,596 $5,400 Implemented