IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

296

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0808 # 16 Y:2009 16 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,446 $1,000 Implemented
UD0808 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,771 $1,840 Not Implemented
UD0808 # 15 Y:2009 15 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,291 $17,933 Not Implemented
UD0808 # 23 Y:2009 23 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,412 $5,050 Not Implemented
UD0808 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $68,888 $60,000 Not Implemented
UD0808 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,197 $23,136 Not Implemented
UD0808 # 12 Y:2009 12 2009 UPGRADE CONTROLS ON COMPRESSORS $17,167 $0 Not Implemented
UD0808 # 18 Y:2009 18 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,518 $21,818 Not Implemented
UD0808 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $200,411 $425,000 Not Implemented
UD0808 # 20 Y:2009 20 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,344 $7,155 Not Implemented
UD0808 # 13 Y:2009 13 2009 INSULATE BARE EQUIPMENT $15,493 $33,695 Not Implemented
UD0808 # 24 Y:2009 24 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,053 $0 Not Implemented
UD0808 # 21 Y:2009 21 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,836 $0 Implemented
UD0808 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,538 $59,100 Not Implemented
UD0808 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $95,164 $300,000 Not Implemented
UD0808 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $74,208 $223,000 Not Implemented
UD0808 # 14 Y:2009 14 2009 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $10,381 $34,730 Not Implemented
UD0808 # 09 Y:2009 09 2009 COVER OPEN TANKS $25,313 $0 Not Implemented
UD0808 # 19 Y:2009 19 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,269 $20,543 Not Implemented
UD0808 # 06 Y:2009 06 2009 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $67,977 $135,954 Not Implemented
UD0808 # 11 Y:2009 11 2009 MODERATE COOLING TOWER OUTLET TEMPERATURE $18,970 $20,000 Not Implemented
UD0808 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $108,914 $25,000 Not Implemented
UD0808 # 22 Y:2009 22 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,305 $18,884 Not Implemented
UD0808 # 25 Y:2009 25 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $0 Not Implemented
UD0808 # 17 Y:2009 17 2009 INSULATE BARE EQUIPMENT $8,068 $11,383 Not Implemented