IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0398 # 08 Y:2021 08 2021 USE PHOTOCELL CONTROLS $1,120 $4,014 Not Implemented
MI0398 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $4,059 Not Implemented
MI0398 # 06 Y:2021 06 2021 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $5,300 $9,444 Not Implemented
MI0398 # 05 Y:2021 05 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,350 $849 Not Implemented
MI0398 # 04 Y:2021 04 2021 PAY UTILITY BILLS ON TIME $11,152 $0 Not Implemented
MI0398 # 03 Y:2021 03 2021 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,084 $100 Not Implemented
MI0398 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,526 $2,020 Not Implemented
MI0398 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,694 $1,650 Not Implemented
MI0396 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,464 $3,060 Not Implemented
MI0396 # 06 Y:2021 06 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,320 $1,290 Not Implemented
MI0396 # 05 Y:2021 05 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,263 $1,487 Not Implemented
MI0396 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,908 $2,020 Implemented
MI0396 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,588 $100 Not Implemented
MI0396 # 01 Y:2021 01 2021 PAY UTILITY BILLS ON TIME $27,408 $0 Implemented
MI0392 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $369 $1,552 Not Implemented
MI0392 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $1,242 Not Implemented
MI0392 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $2,592 $3,961 Not Implemented
MI0392 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,982 $4,270 Not Implemented
MI0388 # 01 Y:2021 01 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $132,105 $960 Not Implemented
MI0388 # 05 Y:2021 05 2021 REPAIR OR REPLACE STEAM TRAPS $13,798 $4,080 Implemented
MI0388 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $31,640 $80 Implemented
MI0388 # 03 Y:2021 03 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,022 $38,081 Implemented
MI0388 # 02 Y:2021 02 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,796 $86,796 Not Implemented