IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

480

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0063 # 08 Y:1996 08 1996 ISOLATE HOT OR COLD EQUIPMENT $5,283 $300 Implemented
KG0063 # 09 Y:1996 09 1996 USE OPTIMUM TEMPERATURE $3,805 $0 Implemented
KG0063 # 10 Y:1996 10 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $11,613 $0 Implemented
KG0063 # 11 Y:1996 11 1996 RECOVER AND REUSE WASTE MATERIAL $557,549 $5,000 Not Implemented
AM0277 # 01 Y:1996 01 1996 $351,900 $70,000 Not Implemented
AM0277 # 02 Y:1996 02 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $34,050 $30,000 Implemented
AM0277 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $28,650 $180 Implemented
AM0277 # 04 Y:1996 04 1996 OPTIMIZE PLANT POWER FACTOR $22,800 $25,000 Not Implemented
AM0277 # 05 Y:1996 05 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,300 $0 Not Implemented
AM0277 # 06 Y:1996 06 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $2,420 $4,410 Implemented
AM0277 # 07 Y:1996 07 1996 METER WASTE WATER $1,600 $2,500 Implemented
AM0277 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $1,250 $50 Not Implemented
AM0277 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $880 $50 Not Implemented
AM0277 # 10 Y:1996 10 1996 INSULATE BARE EQUIPMENT $860 $860 Not Implemented
AM0277 # 11 Y:1996 11 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $120 Implemented
KG0062 # 01 Y:1996 01 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $48,359 $50 Implemented
KG0062 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,928 $44,000 Implemented
KG0062 # 03 Y:1996 03 1996 AVOID FROST FORMATION ON EVAPORATORS $12,480 $4,500 Not Implemented
KG0062 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,393 $35,270 Implemented
KG0062 # 05 Y:1996 05 1996 AVOID FROST FORMATION ON EVAPORATORS $1,596 $3,000 Implemented
KG0062 # 06 Y:1996 06 1996 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $906 $2,204 Implemented
KG0062 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $629 $314 Implemented
KG0062 # 08 Y:1996 08 1996 INSTALL TIMERS AND/OR THERMOSTATS $599 $300 Not Implemented
KG0062 # 09 Y:1996 09 1996 TREAT AND REUSE RINSE WATERS $21,972 $0 Implemented
KG0062 # 10 Y:1996 10 1996 TREAT AND REUSE RINSE WATERS $23,328 $0 Not Implemented