Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
823
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0268 # 01 Y:2025 | 01 | 2025 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $25,676 | $9,660 | n/a |
UU0268 # 04 Y:2025 | 04 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $31,296 | $7,800 | n/a |
UU0268 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM TEMPERATURE | $680,810 | $2,017,330 | n/a |
UU0268 # 05 Y:2025 | 05 | 2025 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $11,222 | $30,630 | n/a |
UU0268 # 02 Y:2025 | 02 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $101,028 | $4,860 | n/a |
UU0268 # 03 Y:2025 | 03 | 2025 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,514 | $6,920 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |
UU0267 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,456 | $3,600 | n/a |
UU0267 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $6,000 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
UU0267 # 04 Y:2025 | 04 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,650 | $9,727 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |
UU0266 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,681 | $22,500 | n/a |
UU0266 # 02 Y:2025 | 02 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $8,217 | $13,000 | n/a |
UU0266 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,730 | $6,960 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $38,200 | n/a |
UU0265 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,000 | $5,450 | n/a |
UU0265 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,450 | $9,720 | n/a |
UU0265 # 05 Y:2025 | 05 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,338 | $5,515 | n/a |
UU0265 # 01 Y:2025 | 01 | 2025 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,697 | $45,926 | n/a |