IAC logo
IAC Assessment: AM0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1987
Principal Product PREFABRICATED METAL BUILDINGS
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 120 Pieces
Production Hrs. Annual 2,600
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,539 483,880 kWh $0.08
LPG $7,358 943 MMBtu $7.80
TOTAL ENERGY COSTS $43,897
RECOMMENDED SAVINGS* $3,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,605
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$945
Cost:
$300
$945 27,843 - - $945
27,843
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$279
Cost:
$94
$279 4,396 - - $279
4,396
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$555
Cost:
-
$555 8,499 - - $555
8,499
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$460
Cost:
$300
$460 13,482 - - $460
13,482
kWh
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$362
Cost:
$500
$362 13,189 - - $362
13,189
kWh
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$460
Cost:
$200
- - $460 59 -
-
kWh
$460
59
MMBtu
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$283
Cost:
$50
$283 8,206 - - $283
8,206
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$67
$83 1,172 - - $83
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,427
Cost:
$1,511
$2,967 76,787 $460 59 $2,967
76,787
kWh
$460
59
MMBtu
TOTAL IMPLEMENTED Savings:
$2,605
Cost:
$1,150
$2,605 71,219 - - $2,605
71,219
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG