IAC Assessment: AM0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product AIR CONDITIONING EQUIPMENT
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pounds
Production Hrs. Annual 2,080
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,798 543,083 kWh $0.08
Natural Gas $9,606 1,655 MMBtu $5.80
TOTAL ENERGY COSTS $51,404
RECOMMENDED SAVINGS* $8,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,523
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,386
Cost:
$5,364
$2,386 - - - - - $2,386
-
kWh
-
-
MMBtu
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$1,535
Cost:
$427
$345 2,345 $1,190 205 - - $345
2,345
kWh
$1,190
205
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,322
Cost:
$1,100
- - $1,322 228 - - -
-
kWh
$1,322
228
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,205
Cost:
$150
$1,205 33,705 - - - - $1,205
33,705
kWh
-
-
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,091
Cost:
$2,400
- - $577 89 $514 - -
-
kWh
$577
89
MMBtu
$514
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$330
Cost:
$131
$330 4,396 - - - - $330
4,396
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40
Cost:
$35
$40 586 - - - - $40
586
kWh
-
-
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$111
Cost:
$100
$111 3,224 - - - - $111
3,224
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,020
Cost:
$9,707
$4,417 44,256 $3,089 522 $514 - $4,417
44,256
kWh
$3,089
522
MMBtu
$514
-
$
TOTAL IMPLEMENTED Savings:
$5,523
Cost:
$4,243
$1,920 41,032 $3,089 522 $514 - $1,920
41,032
kWh
$3,089
522
MMBtu
$514
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes