IAC logo
IAC Assessment: AM0033
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0033
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product CATTLE & HORSES PROCESS
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 108,000 Pieces
Production Hrs. Annual 2,340
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $465,245 10,709,848 kWh $0.04
Natural Gas $162,553 56,300 MMBtu $2.89
TOTAL ENERGY COSTS $627,798
RECOMMENDED SAVINGS* $33,518 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,847
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,218
Cost:
$49,800
$(-1,542) (-54,513) $10,760 5,314 - - $(-1,542)
(-54,513)
kWh
$10,760
5,314
MMBtu
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,089
Cost:
$6,575
$4,089 144,490 - - - - $4,089
144,490
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,800
Cost:
$16,400
$3,800 56,272 - - - - $3,800
56,272
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,454
Cost:
$810
- - $3,454 1,706 - - -
-
kWh
$3,454
1,706
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,827
Cost:
$4,000
$2,827 84,115 - - - - $2,827
84,115
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,496
Cost:
$11,180
- - $2,746 1,357 $1,750 - -
-
kWh
$2,746
1,357
MMBtu
$1,750
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,210
Cost:
$11,080
$2,210 32,239 - - - - $2,210
32,239
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,107
Cost:
-
$2,107 74,443 - - - - $2,107
74,443
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$460
Cost:
$144
$460 6,741 - - - - $460
6,741
kWh
-
-
MMBtu
-
-
$
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$393
Cost:
$300
- - $393 194 - - -
-
kWh
$393
194
MMBtu
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$279
Cost:
$1,000
$279 9,965 - - - - $279
9,965
kWh
-
-
MMBtu
-
-
$
12: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$135
Cost:
-
$135 4,689 - - - - $135
4,689
kWh
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50
Cost:
$152
$50 879 - - - - $50
879
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,518
Cost:
$101,441
$14,415 359,320 $17,353 8,571 $1,750 - $14,415
359,320
kWh
$17,353
8,571
MMBtu
$1,750
-
$
TOTAL IMPLEMENTED Savings:
$3,847
Cost:
$1,110
- - $3,847 1,900 - - -
-
kWh
$3,847
1,900
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes