IAC logo
IAC Assessment: AM0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product AERIAL HYDRAULIC LIFTS
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 1,820 Pieces
Production Hrs. Annual 2,160
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,435 1,099,941 kWh $0.05
Natural Gas $8,618 1,920 MMBtu $4.49
TOTAL ENERGY COSTS $66,053
RECOMMENDED SAVINGS* $8,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,355
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,912
Cost:
-
$4,912 181,125 - - $4,912
181,125
kWh
-
-
MMBtu
02: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$1,311
Cost:
$6,200
- - $1,311 292 -
-
kWh
$1,311
292
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$938
Cost:
$550
- - $938 209 -
-
kWh
$938
209
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$696
Cost:
$85
$296 10,844 $400 89 $296
10,844
kWh
$400
89
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$580
Cost:
$300
$580 21,395 - - $580
21,395
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$141
Cost:
$128
$141 2,052 - - $141
2,052
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,578
Cost:
$7,263
$5,929 215,416 $2,649 590 $5,929
215,416
kWh
$2,649
590
MMBtu
TOTAL IMPLEMENTED Savings:
$2,355
Cost:
$1,063
$1,017 34,291 $1,338 298 $1,017
34,291
kWh
$1,338
298
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas