IAC logo
IAC Assessment: AM0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product CHEMICAL FORMULATIONS
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 0
Annual Production 202,400 Pieces
Production Hrs. Annual 2,777
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,961 412,954 kWh $0.07
Natural Gas $5,101 1,310 MMBtu $3.89
TOTAL ENERGY COSTS $36,062
RECOMMENDED SAVINGS* $2,733 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,156
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,523
Cost:
$2,737
$1,219 18,464 - - $304 - $1,219
18,464
kWh
-
-
MMBtu
$304
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$372
Cost:
$500
- - $522 140 $(-150) - -
-
kWh
$522
140
MMBtu
$(-150)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$309
Cost:
-
$309 6,448 - - - - $309
6,448
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$276
Cost:
$250
- - $276 74 - - -
-
kWh
$276
74
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$54
Cost:
$47
$54 879 - - - - $54
879
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$123
Cost:
$225
$61 1,172 $62 17 - - $61
1,172
kWh
$62
17
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$76
Cost:
$200
$76 1,465 - - - - $76
1,465
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,733
Cost:
$3,959
$1,719 28,428 $860 231 $154 - $1,719
28,428
kWh
$860
231
MMBtu
$154
-
$
TOTAL IMPLEMENTED Savings:
$1,156
Cost:
$1,175
$446 9,085 $860 231 $(-150) - $446
9,085
kWh
$860
231
MMBtu
$(-150)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes