IAC logo
IAC Assessment: AM0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product PRE-HUNG DOOR UNITS
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 46,800 Pieces
Production Hrs. Annual 2,032
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,650 1,143,025 kWh $0.08
LPG $6,313 1,053 MMBtu $6.00
TOTAL ENERGY COSTS $97,963
RECOMMENDED SAVINGS* $4,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,085
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,437
Cost:
$2,782
$2,190 26,964 - - $247 - $2,190
26,964
kWh
-
-
MMBtu
$247
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$690
Cost:
-
$690 16,999 - - - - $690
16,999
kWh
-
-
MMBtu
-
-
$
03: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$476
Cost:
-
- - $476 79 - - -
-
kWh
$476
79
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$425
Cost:
$1,520
- - $425 71 - - -
-
kWh
$425
71
MMBtu
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$395
Cost:
-
$395 9,672 - - - - $395
9,672
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$305
Cost:
$225
$305 7,620 - - - - $305
7,620
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,728
Cost:
$4,527
$3,580 61,255 $901 150 $247 - $3,580
61,255
kWh
$901
150
MMBtu
$247
-
$
TOTAL IMPLEMENTED Savings:
$1,085
Cost:
-
$1,085 26,671 - - - - $1,085
26,671
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes