IAC logo
IAC Assessment: AM0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1988
Principal Product CYLINDERS, PUMPS, MOTORS
NAICS n/a
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Pieces
Production Hrs. Annual 2,660
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,630 352,579 kWh $0.07
Natural Gas $11,693 2,417 MMBtu $4.84
TOTAL ENERGY COSTS $37,323
RECOMMENDED SAVINGS* $3,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,270
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,838
Cost:
$3,000
$1,838 - - - - - $1,838
-
kWh
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$645
Cost:
$40
$45 1,465 $600 125 - - $45
1,465
kWh
$600
125
MMBtu
-
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$400
Cost:
$40
- - - - $400 - -
-
kWh
-
-
MMBtu
$400
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$275
Cost:
$550
- - $275 57 - - -
-
kWh
$275
57
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48
Cost:
$32
$48 879 - - - - $48
879
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$194
Cost:
$225
$60 2,052 $134 28 - - $60
2,052
kWh
$134
28
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$145
Cost:
$336
$105 3,224 - - $40 - $105
3,224
kWh
-
-
MMBtu
$40
-
$
TOTAL RECOMMENDED Savings:
$3,545
Cost:
$4,223
$2,096 7,620 $1,009 210 $440 - $2,096
7,620
kWh
$1,009
210
MMBtu
$440
-
$
TOTAL IMPLEMENTED Savings:
$3,270
Cost:
$3,673
$2,096 7,620 $734 153 $440 - $2,096
7,620
kWh
$734
153
MMBtu
$440
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes