IAC logo
IAC Assessment: AM0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product FABRICATED STEEL PRODUCTS
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 0
Annual Production 14,500 Tons
Production Hrs. Annual 2,295
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,479 1,844,959 kWh $0.07
Natural Gas $28,018 5,939 MMBtu $4.72
TOTAL ENERGY COSTS $149,497
RECOMMENDED SAVINGS* $10,065 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,819
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,552
Cost:
$2,400
- - $1,552 330 - - -
-
kWh
$1,552
330
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,299
Cost:
$800
$3,299 108,734 - - - - $3,299
108,734
kWh
-
-
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,520
Cost:
-
$2,520 82,943 - - - - $2,520
82,943
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,370
Cost:
-
$1,370 19,637 - - - - $1,370
19,637
kWh
-
-
MMBtu
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$970
Cost:
$2,700
$100 3,224 - - $870 - $100
3,224
kWh
-
-
MMBtu
$870
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50
Cost:
$60
$50 879 - - - - $50
879
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$69
Cost:
$5
$69 879 - - - - $69
879
kWh
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$130
Cost:
-
$130 3,810 - - - - $130
3,810
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$105
Cost:
-
$105 3,517 - - - - $105
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,065
Cost:
$5,965
$7,643 223,623 $1,552 330 $870 - $7,643
223,623
kWh
$1,552
330
MMBtu
$870
-
$
TOTAL IMPLEMENTED Savings:
$5,819
Cost:
$800
$5,819 191,677 - - - - $5,819
191,677
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes