Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product MODULAR BUILDINGS
NAICS n/a
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 35 Pieces
Production Hrs. Annual 2,150
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,513 1,157,093 kWh $0.06
Natural Gas $2,226 408 MMBtu $5.46
TOTAL ENERGY COSTS $76,739
RECOMMENDED SAVINGS* $5,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,340
Cost:
$3,965
$3,340 60,082 - - $3,340
60,082
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$970
Cost:
$500
$970 18,464 - - $970
18,464
kWh
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$425
Cost:
-
$425 7,913 - - $425
7,913
kWh
-
-
MMBtu
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$223
Cost:
-
- - $223 - -
-
kWh
$223
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$150
Cost:
-
- - $150 28 -
-
kWh
$150
28
MMBtu
06: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$80
Cost:
-
$80 1,465 - - $80
1,465
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$92
Cost:
-
$92 1,758 - - $92
1,758
kWh
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$70
Cost:
$65
$70 1,172 - - $70
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,350
Cost:
$4,530
$4,977 90,854 $373 28 $4,977
90,854
kWh
$373
28
MMBtu
TOTAL IMPLEMENTED Savings:
$92
Cost:
-
$92 1,758 - - $92
1,758
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas