IAC Assessment: AM0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product CORRUGATED CONTAINERS
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,470 4,346,131 kWh $0.05
Natural Gas $158,500 43,227 MMBtu $3.67
TOTAL ENERGY COSTS $375,970
RECOMMENDED SAVINGS* $52,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,244
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,000
Cost:
$270
- - $7,000 1,825 -
-
kWh
$7,000
1,825
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$18,950
Cost:
$29,790
$18,950 - - - $18,950
-
kWh
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,660
Cost:
$19,050
$(-1,270) (-30,774) $15,930 4,340 $(-1,270)
(-30,774)
kWh
$15,930
4,340
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,990
Cost:
$1,000
- - $2,990 784 -
-
kWh
$2,990
784
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,029
Cost:
$840
- - $3,029 795 -
-
kWh
$3,029
795
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,490
Cost:
$540
$2,490 60,082 - - $2,490
60,082
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,275
Cost:
$500
$2,275 84,994 - - $2,275
84,994
kWh
-
-
MMBtu
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$745
Cost:
-
$745 27,843 - - $745
27,843
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$80
$83 1,172 - - $83
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$52,222
Cost:
$52,070
$23,273 143,317 $28,949 7,744 $23,273
143,317
kWh
$28,949
7,744
MMBtu
TOTAL IMPLEMENTED Savings:
$34,244
Cost:
$32,400
$21,225 84,994 $13,019 3,404 $21,225
84,994
kWh
$13,019
3,404
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas