IAC logo
IAC Assessment: AM0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product OILFIELD VALVES & EQUIPMENT
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 500 Pieces
Production Hrs. Annual 2,912
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,591 625,147 kWh $0.06
Natural Gas $7,335 1,626 MMBtu $4.51
Other Energy $6,240 811 MMBtu $7.69
TOTAL ENERGY COSTS $54,166
RECOMMENDED SAVINGS* $7,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,987
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,350
Cost:
$3,160
$2,350 56,272 - - - - $2,350
56,272
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,090
Cost:
$7,752
$2,090 35,170 - - - - $2,090
35,170
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$1,440
Cost:
$2,000
- - $1,440 320 - - -
-
kWh
$1,440
320
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$828
Cost:
$500
$828 19,930 - - - - $828
19,930
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$624
Cost:
$420
- - - - $624 81 -
-
kWh
-
-
MMBtu
$624
81
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$119
Cost:
$95
$119 2,052 - - - - $119
2,052
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$300
Cost:
$105
$300 5,569 - - - - $300
5,569
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$116
Cost:
-
$116 2,931 - - - - $116
2,931
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,867
Cost:
$14,032
$5,803 121,924 $1,440 320 $624 81 $5,803
121,924
kWh
$1,440
320
MMBtu
$624
81
MMBtu
TOTAL IMPLEMENTED Savings:
$1,987
Cost:
$1,120
$1,363 30,482 - - $624 81 $1,363
30,482
kWh
-
-
MMBtu
$624
81
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu