IAC logo
IAC Assessment: AM0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product RUBBER OIL-WELL EQUIPMENT
NAICS n/a
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 11,100 Pieces
Production Hrs. Annual 4,583
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,599 1,361,958 kWh $0.07
Natural Gas $19,812 4,140 MMBtu $4.79
TOTAL ENERGY COSTS $109,411
RECOMMENDED SAVINGS* $11,099 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,370
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$5,300
Cost:
$1,750
- - - - $5,300 - -
-
kWh
-
-
MMBtu
$5,300
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,770
Cost:
$250
$2,770 63,599 - - - - $2,770
63,599
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,340
Cost:
$650
- - $1,340 280 - - -
-
kWh
$1,340
280
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,300
Cost:
$2,400
- - $1,300 - - - -
-
kWh
$1,300
-
MMBtu
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$325
Cost:
-
$325 7,327 - - - - $325
7,327
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$64
Cost:
$176
$64 879 - - - - $64
879
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,099
Cost:
$5,226
$3,159 71,805 $2,640 280 $5,300 - $3,159
71,805
kWh
$2,640
280
MMBtu
$5,300
-
$
TOTAL IMPLEMENTED Savings:
$9,370
Cost:
$4,400
$2,770 63,599 $1,300 - $5,300 - $2,770
63,599
kWh
$1,300
-
MMBtu
$5,300
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes