IAC logo
IAC Assessment: AM0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product STONE-WASHED JEANS
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 7,000,000 Pieces
Production Hrs. Annual 7,292
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,958 4,470,985 kWh $0.05
Natural Gas $337,134 122,259 MMBtu $2.76
TOTAL ENERGY COSTS $582,092
RECOMMENDED SAVINGS* $41,516 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,172
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$28,911
Cost:
$6,400
$28,911 - - - - - $28,911
-
kWh
-
-
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,380
Cost:
$800
- - $4,380 1,585 - - -
-
kWh
$4,380
1,585
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,860
Cost:
-
$3,860 57,737 - - - - $3,860
57,737
kWh
-
-
MMBtu
-
-
$
04: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$2,932
Cost:
$175
- - $700 255 $2,232 - -
-
kWh
$700
255
MMBtu
$2,232
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$900
Cost:
$800
$900 20,516 - - - - $900
20,516
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$154
Cost:
$91
$154 2,345 - - - - $154
2,345
kWh
-
-
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$285
Cost:
$83
$105 2,345 $180 62 - - $105
2,345
kWh
$180
62
MMBtu
-
-
$
09: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$94
Cost:
$500
- - - - $94 - -
-
kWh
-
-
MMBtu
$94
-
$
TOTAL RECOMMENDED Savings:
$41,516
Cost:
$8,849
$33,930 82,943 $5,260 1,902 $2,326 - $33,930
82,943
kWh
$5,260
1,902
MMBtu
$2,326
-
$
TOTAL IMPLEMENTED Savings:
$11,172
Cost:
$975
$3,860 57,737 $5,080 1,840 $2,232 - $3,860
57,737
kWh
$5,080
1,840
MMBtu
$2,232
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes