IAC logo
IAC Assessment: AM0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product ELECTRONIC FLOW COMPUTERS
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 420
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,538
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $562,737 11,094,080 kWh $0.05
Natural Gas $43,890 9,306 MMBtu $4.72
TOTAL ENERGY COSTS $606,627
RECOMMENDED SAVINGS* $38,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,860
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$14,260
Cost:
$47,700
$14,260 683,470 - - $14,260
683,470
kWh
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$12,365
Cost:
-
- - $12,365 2,620 -
-
kWh
$12,365
2,620
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,240
Cost:
-
$4,240 63,892 - - $4,240
63,892
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,360
Cost:
$1,000
$3,360 120,750 - - $3,360
120,750
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$536
Cost:
$116
$536 7,327 - - $536
7,327
kWh
-
-
MMBtu
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,485
Cost:
$2,000
$2,485 89,390 - - $2,485
89,390
kWh
-
-
MMBtu
07: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$1,110
Cost:
$4,000
- - $1,110 235 -
-
kWh
$1,110
235
MMBtu
TOTAL RECOMMENDED Savings:
$38,356
Cost:
$54,816
$24,881 964,829 $13,475 2,855 $24,881
964,829
kWh
$13,475
2,855
MMBtu
TOTAL IMPLEMENTED Savings:
$21,860
Cost:
$48,700
$21,860 868,112 - - $21,860
868,112
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas