IAC logo
IAC Assessment: AM0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1989
Principal Product OIL FIELD TOOLS
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 5,042
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $370,650 8,521,981 kWh $0.04
Natural Gas $94,618 20,182 MMBtu $4.69
TOTAL ENERGY COSTS $465,268
RECOMMENDED SAVINGS* $84,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,996
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45,100
Cost:
$82,000
$45,100 937,866 - - $45,100
937,866
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,470
Cost:
$24,000
$(-1,800) (-17,585) $15,270 3,270 $(-1,800)
(-17,585)
kWh
$15,270
3,270
MMBtu
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$9,950
Cost:
$56,300
$9,950 373,681 - - $9,950
373,681
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,400
Cost:
$1,000
$5,400 203,107 - - $5,400
203,107
kWh
-
-
MMBtu
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$3,941
Cost:
-
$3,941 - - - $3,941
-
kWh
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,900
Cost:
$2,900
$2,900 109,906 - - $2,900
109,906
kWh
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,670
Cost:
$350
$1,670 35,170 - - $1,670
35,170
kWh
-
-
MMBtu
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,085
Cost:
-
$1,085 - - - $1,085
-
kWh
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$680
Cost:
-
$680 25,498 - - $680
25,498
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$84,196
Cost:
$166,550
$68,926 1,667,643 $15,270 3,270 $68,926
1,667,643
kWh
$15,270
3,270
MMBtu
TOTAL IMPLEMENTED Savings:
$14,996
Cost:
$4,250
$14,996 348,183 - - $14,996
348,183
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas