IAC logo
IAC Assessment: AM0077
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0077
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product OIL FIELD TUBING
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $1,000,000-$5,000,000
# of Employees 27
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,548 1,092,028 kWh $0.07
Natural Gas $274,763 78,754 MMBtu $3.49
TOTAL ENERGY COSTS $346,311
RECOMMENDED SAVINGS* $30,629 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,629
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,200
Cost:
$51,900
$(-5,110) (-55,686) $18,310 6,900 $(-5,110)
(-55,686)
kWh
$18,310
6,900
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,385
Cost:
$12,000
$10,385 - - - $10,385
-
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,660
Cost:
$1,500
$5,660 149,472 - - $5,660
149,472
kWh
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$910
Cost:
-
$910 19,050 - - $910
19,050
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$440
Cost:
-
$440 8,792 - - $440
8,792
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34
Cost:
$31
$34 586 - - $34
586
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,629
Cost:
$65,431
$12,319 122,214 $18,310 6,900 $12,319
122,214
kWh
$18,310
6,900
MMBtu
TOTAL IMPLEMENTED Savings:
$30,629
Cost:
$65,431
$12,319 122,214 $18,310 6,900 $12,319
122,214
kWh
$18,310
6,900
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas