IAC Assessment: AM0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1990
Principal Product PIPE THREADS & COUPLINGS
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Pieces
Production Hrs. Annual 5,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $314,254 6,426,143 kWh $0.05
TOTAL ENERGY COSTS $314,254
RECOMMENDED SAVINGS* $32,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,370
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,500
Cost:
$27,000
$21,000 498,242 $(-12,500) (-2,500) $21,000
498,242
kWh
$(-12,500)
(-2,500)
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,790
Cost:
$21,500
$7,790 - - - $7,790
-
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,600
Cost:
$500
$4,600 169,695 - - $4,600
169,695
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,000
Cost:
-
$4,000 149,472 - - $4,000
149,472
kWh
-
-
MMBtu
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,860
Cost:
-
$3,860 143,611 - - $3,860
143,611
kWh
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,800
Cost:
$400
$1,800 67,409 - - $1,800
67,409
kWh
-
-
MMBtu
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,400
Cost:
-
$1,400 51,290 - - $1,400
51,290
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$180
Cost:
$170
$180 2,638 - - $180
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,130
Cost:
$49,570
$44,630 1,082,357 $(-12,500) (-2,500) $44,630
1,082,357
kWh
$(-12,500)
(-2,500)
MMBtu
TOTAL IMPLEMENTED Savings:
$18,370
Cost:
$22,570
$18,370 389,214 - - $18,370
389,214
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas