IAC Assessment: AM0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1991
Principal Product DRILL FLUID CONDITIONING EQUIPMENT
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 3,250
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,461 1,060,961 kWh $0.07
Natural Gas $4,812 1,216 MMBtu $3.96
TOTAL ENERGY COSTS $81,273
RECOMMENDED SAVINGS* $2,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,260
Cost:
$5,180
$1,260 - $1,260
-
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$510
Cost:
$750
$510 6,155 $510
6,155
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$131
Cost:
$105
$131 2,052 $131
2,052
kWh
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$315
Cost:
$52
$315 4,689 $315
4,689
kWh
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$240
Cost:
$100
$240 3,517 $240
3,517
kWh
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$200
Cost:
$160
$200 3,810 $200
3,810
kWh
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$85
Cost:
-
$85 1,758 $85
1,758
kWh
TOTAL RECOMMENDED Savings:
$2,741
Cost:
$6,347
$2,741 21,981 $2,741
21,981
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage